Open topic with left hand navigation
It is possible that a drawing or catalog card revision added to a package may not be the latest or the accepted revision when the package is issued.
Use the Update Revision button on the Bidder Instructions and Scope of Work pages to update each line item to the latest revision. These changes will be immediately reflected in the invitations generated from the package.
Tip
|
When you click Update Revision, you can update the drawing or catalog card list in the following ways:
Note: If a drawing or catalog card has no Accepted revision, then no update occurs—the current revision continues to show in the list.
Proliance saves the Bid Package document prior to updating the list.